Project Profile

The Assembly

Historic Renovation, Mixed-Use, Multifamily

Living With a View

Adaptive Reuse Mixed-Use

Sachse Construction managed the renovation of The Assembly in Detroit, MI. The adaptive reuse and historic renovation apartment buildout comprised of 32 units on the fourth and fifth floors of the building, with the first through third floors being tenant white box space.

As the building is a former dry goods storage facility, the building’s structure has fragile areas that require reinforcing and special attention. Additionally, the team was renovating the building under historic codes, so modern improvements must be approved or modified to meet the historic requirements. This specific challenge has strengthened the project team’s communication and collaboration as adhering to historic codes requires a full coordination effort from the owner, architect, and Sachse teams.

The Assembly provides housing for Detroiters and office space for commercial tenants with the bonus of featuring an incredible view of the downtown cityscape.

Similar Projects
View More Projects